Full demolition and replacement of existing HVAC infrastructure for the Wastewater Treatment Plant Public Access Building, including removal of 43 RTUs, all ducted and refrigerant lines, supporting framework, electrical feeds, controls, and associated components. Installation of new HVAC equipment, systems, and appurtenances complete and fully operational.
Details
Industry:
Engineer:
Cost:
Wastewater Treatment Plant
Additional:
City of Sacramento
1,590,000
Focused on the renovation and replacement of heating, ventilation, and air conditioning systems within the plant.