Entire removal and installation of all the HVAC equipment, lines, RTUs, framework , electrical for the Wastewater Treatment Plant Public Access Building. 43 Units
Details
Industry:
Engineer:
Cost:
Wastewater Treatment Plant
Additional:
City of Sacramento
1,590,000
Focused on the renovation and replacement of heating, ventilation, and air conditioning systems within the plant.