Installation and integration of owner-furnished hydrogen equipment at the Division 4 site, including all associated civil site improvements; complete electrical systems and utility connections; installation and coordination of fire alarm and fire sprinkler systems; construction of a new protective canopy; and removal and replacement of the existing generator to support the upgraded facility and ensure full operational readiness.
Details
Industry:
Engineer:
Cost:
Pump + Lift Station
Additional:
Jason Auyeung
$2,690,000.00
"AC Transit’s Zero Emission Bus Fleet to include hydrogen fuel cell electric and all-electric buses." -AC Transit