Demolition of the existing restroom facility; abatement and proper disposal of hazardous materials; repair of sinkhole damage and storm drain infrastructure; and construction/installation of a pre-engineered Romtec Inc. restroom building, including a monolithic concrete slab foundation, along with ADA-compliant sidewalk and accessibility improvements.